PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing black iron duct work at the 4th floor Facing South.jpg Installing sprinkler branches at the 4th floor Facing West.jpg Installing VAV boxes at the 3rd floor Facing East.jpg EPDM Roofing at the High Roof Facing East.jpg Installing EPDM at the High Roof Facing East.jpg Installing Waste and Vent piping at the 3rd floor bathrooms Facing South.jpg
Previous pageNext page Installing EPDM at the High Roof Facing East
Installing EPDM at the High Roof Facing East